Location: Barrow Island
Challenge:
The client required a custom platform to streamline the fin fan changeout process, which previously relied on scaffolding. The scaffolding system posed safety risks, extended shutdown times, and incurred recurring costs for rental, assembly, and disassembly.
Solution:
OEM Group® designed and delivered 13 custom platforms tailored to meet the client’s specific needs. These platforms eliminated the need for scaffolding, allowing maintenance workers to position themselves exactly where needed to complete tasks safely and efficiently.
Outcomes:
- Enhanced safety by removing the hazards associated with scaffolding.
- Reduced shutdown times, increasing overall productivity.
- Significant cost savings by eliminating the need for scaffolding rental and associated labour.